iTech Tower at Tsuen Wan is the first high-tier data centre building of Grand Ming Group, it was converted from an industrial building in 2007. The first data centre space was successfully delivered to our customer in 2008. With the growing demand of high-tier data centre space, we acquired a piece of land situated in Kwai Chung for the development of second iTech Tower.

Our high-tier data centres are designed and built for the requirement of high availability. We leverage the strength of our parent company in building construction, and have the professional team to ensure the data centre environment could support 24x365 mission critical operation. Our customers included multi-national data centre operators, telecommunication companies and financial institutions.

 
 
infrastructure photo
 
 
 
  • 28 Pak Tin Par Street, Tsuen Wan
  • 10-storey building of GFA ~190,000sq.ft
  • Custom built data centre with dual path for electrical and telecom cabling
  • slab-to-slab >5m, floor loading of 12kPa
  • Utility Power from CLP transmission ring to provide dual 11kV feed, dedicated transformers for data centre use
  • Diesel generators with onsite fuel storage to support continuous operation
  • Uninterruptible Power Supply UPS with 15 minutes battery backup to support mission critical operation
  • Computer Room Air Conditioning to control the temperature and humidity
  • Highly efficient chillers with redundancy to maintain the computer room environment
  • Gas based fire suppression system Inergen/FM200 and / or pre-action sprinkler system
  • BMS to monitor all critical facilities

download pdf iTechTowers e-brochure

 
  • 54-56 Ta Chuen Ping Street, Kwai Chung
  • 15-storey building of gross floor area 108,000sq.ft
  • Custom built data centre with dual path for electrical and telecom cabling
  • slab-to-slab >5m, floor loading of 12-20kPa
  • Utility Power from CLP transmission ring to provide dual 11kV feed, dedicated transformers for data centre use
  • Diesel generators with onsite fuel storage to support continuous operation
  • Uninterruptible Power Supply UPS with 15 minutes battery backup to support mission critical operation
  • Computer Room Air Conditioning to control the temperature and humidity
  • Highly efficient chillers with redundancy to maintain the computer room environment
  • Gas based fire suppression system Inergen/FM200 and / or pre-action sprinkler system
  • BMS to monitor all critical facilities

download pdf  iTechTowers e-brochure

 
  • Land acquired in late 2020
  • Located in Fanling industrial zone
  • An ideal geographical redundancy location
  • A greenfield development of high power density